
Project Description
Iconic 200m long dedicated pedestrian cycle bridge and approaches between the City and Massey University. Multi-award winning.
Nick’s role included preparation of urban design and CPTED responsive Route-Options assessment, community and stakeholder and community engagement and subsequent concept and detailed design inputs. (Note project completed while Nick was working for WSP)
Multi-Award Winning Project
Winner of multiple industry awards including Best Major Project above $5m from Apopo (formerly IPWEA 2019), Consultation and Engagement from NZPI (2019), Innovation from NZTI (2020), Cycling Infrastructure Excellence from Cycling Action Network (2020) and Excellence for Walking Infrastructure from Living Street Aotearoa (2020).
Cyclists and Pedestrians
Adjacent residential
Events
Adjacent camping ground
Road Users
Culture and Heritage
project milestones
Brand Marketing
Duis sed ullamcorper metus ipsum at eros interdum.
Initial Rollout Phase
Duis sed ullamcorper metus ipsum at eros interdum.
key Improvements
Duis sed ullamcorper metus ipsum at eros interdum.
Project Launch
Duis sed ullamcorper metus ipsum at eros interdum.
brief description
Fusce id quam vel dui congue aliquet. Pell entesque laoreet sapien ut facilisis risus interdum placerat felis.
client
Avada Magazine
project budget
$5.2M
date started
16 May 2023